Talk to sales
KaagazyHMISTalk to sales
COMING SOONPart of Links to your machines

Meter readings without the round

Power meters, the generator and building systems send readings into the utilities module. Costs can be split by department.

  • Free walkthrough
  • No commitment
  • Proposal in writing
Kaagazy HMISSample data
Meter links · today
Meters linked9
Manual3
Main power meter1,842 kWh
OT block sub-meter312 kWh
Generator · 3.5 h runCheck diesel
Water meter · Block BManual entry
Kaagazy HMIS

Example screen with sample data.

Sound familiar?

What goes wrong today.

Meters read by hand

A staff member walks to each meter and writes the reading in a book.

One big electricity bill

You pay one bill and cannot tell which department used what.

Generator use guessed

Diesel and generator hours are noted roughly, if at all.

How it works

Simple, step by step.

  1. List the metersWe note your power meters, generator and building systems.
  2. Connect what can shareMeters and systems that can send data are linked to the hub.
  3. Readings flow inReadings reach the utilities module on a schedule.
  4. Costs splitThe utilities module splits usage by department.

In detail

Everything in meters and building systems.

Power meters

Readings from sub-meters by floor or department.

Generator

Running hours and diesel use where the generator shares data.

Building systems

Air conditioning and other BMS readings where available.

Water

Water meter readings where meters can share data.

Unusual use flagged

Sudden jumps in use are shown for checking.

Manual entry too

Meters that cannot connect can still be entered by hand.

Before and after

The difference on day one.

Today

  • Meters are read by hand into a book.
  • One bill, no idea who used what.
  • Generator use is guessed.

With Kaagazy HMIS

  • Linked meters send readings on their own.
  • Use is split by department.
  • Running hours are recorded where possible.

Who uses it

Made for the people doing the work.

Questions

Before you talk to us.

Do we need smart meters?

Only for automatic readings. Other meters can be entered by hand. We check yours in the walkthrough.

Can it control our building systems?

The plan is to read data from them. Control is not part of this.

Where do the readings show?

In the building and utilities module, with costs by department.

Kaagazy HMIS · coming soon

See meters and building systems on your hospital.

Tell us what you want to fix first. We call you, show you Kaagazy HMIS on a free walkthrough, and send a written proposal for your hospital.

  • A free walkthrough on our screens
  • No commitment, no pressure
  • A written proposal for your hospital
  • Your patients' app, Sehat, free

Prefer to talk now? +91 86790 44459 or WhatsApp us

12Step 1 of 2
What do you want to fix first? Pick any